01

Bengeworth Road 400/132kV - SF6-free GIS

Design-stage support for a modern SF6-free GIS substation environment, demonstrating GA Power’s experience with advanced GIS technology and design assurance.

02

Wimbledon 400kV and New Cross 400/275kV GIS Extensions

Stage-specific HV Plant technical support for GIS extension projects, including design review and interface considerations.

03

Norwich 400kV Extension and Grid Park Connection

AIS extension and grid park connection experience with focus on practical layout, equipment arrangement and assurance support.

04

Littlehorsted 400kV Greenfield AIS Substation

Greenfield AIS substation experience supporting major transmission infrastructure delivery.

05

SSEN Fort Augustus 400kV SF6-free GIS

Ongoing technical support and HV Plant assurance experience for a major SSEN project environment.

06

Richborough 400kV GIS - NEMO Link

Led primary system design of an 8-bay compact GIS double busbar substation supporting the UK-Belgium HVDC interconnector interface.

07

Didcot / Berkswell / Laleham Customer Connection FEED

FEED optioneering for AIS customer connection schemes, including reuse of existing structures / foundations where feasible and cost / sustainability optimisation.

08

Denmark Data Centre 150/22kV AIS Substation

Client-side HV Plant design review and assurance support for a data centre power infrastructure project, including contractor deliverable review and FAT involvement.

09

MeyGen Tidal Stream Project

Primary layout and building design experience for renewable / tidal power infrastructure, demonstrating wider renewable energy interface capability.

10

Rugeley 132kV Cable Sealing End Replacement

GA Power project support including GA, elevation and maintenance drawings, above-ground earthing design and terminal loading schedules.

11

Loch na Cathrach / Knocknagael 275kV Connection

Primary HV engineering support including GA, elevation, connector and maintenance drawings, busbar sizing and short-circuit force calculations.